AISC
American Institute of Steel Construction — publishes the design, fabrication and erection standards most US structural steel projects are detailed against.
AWS
American Welding Society — publishes the welding codes (including AWS D1.1) that define weld symbols, joint types and inspection requirements used on shop drawings.
BIM (Building Information Modeling)
A 3D, data-rich model of a structure — built in software like Tekla Structures — that drives drawings, schedules and fabrication data automatically, instead of maintaining separate 2D sheets by hand.
BOM (Bill of Materials)
A full list of every component in a structure — profile, grade, length, thickness, quantity and piece mark — generated directly from the 3D model.
MTO (Material Take-Off)
The procurement-focused summary of raw material needed to fabricate a project, used to place mill and stock orders and plan cutting.
CJP weld (Complete Joint Penetration)
A weld that extends fully through the joint thickness, giving 100% strength transfer across the connection. Used on high-stress structural joints.
PJP weld (Partial Joint Penetration)
A weld that only partially penetrates the joint depth. Used where the connection doesn't require full-section strength.
DSTV file
A standardized data file format that carries geometry, hole patterns and cut data straight from a 3D model to CNC fabrication machines, eliminating manual re-entry at the machine.
NC file (Numerical Control)
Machine-readable fabrication data exported from a 3D model to drive CNC saws, drills, punches and plasma/laser cutting equipment.
IFC model
Industry Foundation Classes — an open, vendor-neutral 3D file format used to exchange building and structural models between different BIM software packages.
GA drawing (General Arrangement)
A plan and elevation view showing the overall layout of a structure, used for coordination and design approval rather than shop fabrication.
Marking plan
A layout drawing that maps every structural member's unique piece mark onto a grid, with North orientation, elevations and anchor locations, so field crews know exactly where each piece goes.
Erection drawing
A drawing showing how structural members assemble on site — framework layout, member positions, field bolts and field welds — used to guide the erection crew.
Shop drawing
A fabrication-level drawing showing exact cuts, holes, welds and dimensions for a single piece or assembly, used by the fabrication shop to build it.
RFI (Request for Information)
A formal question raised by the field or shop when a drawing is unclear or a site condition doesn't match the design, tracked and answered by the engineer or detailer.
PEB / PEMB (Pre-Engineered Building)
A structure built from tapered, built-up members and cold-formed secondary framing (purlins, girts), optimized for standardized, rapid fabrication and erection.
Purlin
A horizontal secondary structural member that spans between rafters or trusses to support roof cladding.
Girt
A horizontal secondary structural member that spans between columns to support wall cladding.
Base plate
A steel plate welded to the bottom of a column that transfers structural loads into the foundation through anchor bolts.
Gusset plate
A plate used to connect intersecting structural members — such as bracing to a beam or column — transferring load between them.
Chemset / Trubolt
Common post-installed anchor systems — chemical anchor and mechanical expansion anchor respectively — used to fix steel base plates into cured concrete after the pour.
Slip-critical bolt
A high-strength bolted connection tightened to a specified tension so the connected plies transfer load through friction rather than bolt shear, preventing any slip under service load.
Clash detection
The process of digitally checking a 3D model for physical conflicts between structural steel, MEP, architectural and concrete elements before fabrication begins.
Piece mark
A unique identifier assigned to each fabricated member or assembly, used to track it from the shop drawing through fabrication, shipping and field erection.
Revision cloud
A cloud-shaped marking drawn around a part of a drawing that has changed since the previous issue, flagging it for reviewers and the shop floor.
AFC drawing (Approval For Construction)
The current, formally approved drawing revision that the field and shop are authorized to build from.
Wrench clearance
The physical space required around a bolt to fit a wrench or impact tool for tightening, which must be checked during connection detailing.
FRP grating (Fiberglass Reinforced Plastic)
A lightweight, corrosion-resistant decking material used for platforms, walkways and boardwalks in place of steel grating.